国自产在线精品免费_国产精品国产三级在线_精品视频一区二区在线_91天堂素人_欧美亚洲日本在线_视频二区一区国产精品天天

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

Technical Services Current Position:Home > Technical Services

Precautions for GCL construction

Release time:2020-4-7    This article is read :5674 Times

GCL construction

Precautions for GCL construction

1. The site should be kept relatively dry during construction, and the base surface can be wet, but there should be no water accumulation.

2. The laying, connection and interface of the GCL should meet the design requirements and construction specifications, and be firm and stable, without hollowing, damage, slippage, warping, wrinkling and other phenomena.

3. If the impermeable blanket is damaged during the laying process, a pair of GCLs larger than the damaged surface by 30cm ~ 50cm must be cut and covered, and the surrounding area should be coated with bentonite waterproof slurry. 4. After the GCL is laid and inspected, the construction of backfill shall be carried out simultaneously to avoid trample and damage.

5. The GCLs should be stacked in the designated place on the site, and be cushioned to maintain a certain distance from the ground, and covered with plastic film to avoid rainwater immersion, sunlight and moisture.

6. If it rains during the construction process, it should be covered immediately with plastic film materials or rain shielding materials to avoid rainwater soaking and washing the waterproof layer and affecting the construction quality. When the rain is large and the bentonite swells by more than 300%, it should be laid again.

7. The equipment or truck cannot be placed directly on the GCL, and the cover must be set to work.

8. When laying, it is strictly forbidden to put an open flame or cigarette butt on any side of the GCL, and it is strictly forbidden for construction personnel to wear spike shoes.

9. During the construction, if the construction party encounters unclear drawings or the construction site does not conform to the design of the drawings, it should be notified to the designer in time and properly resolved through consultation.

10. For other unfinished matters, the national and local acceptance standards and operating specifications shall be followed during construction.

Precautions for GCL construction
Previous:Comparative analysis of several geotextile materialsnext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: m.liaru.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 情侣偷拍久久 | 91区在线观看 | 久久只精品99品免费久23 | 色综合视频一区二区三区44 | 欧美性猛交久久久乱大交小说 | 一区国产精品 | 国产麻豆一区二区三区在线观看 | 在线观看黄色片 | 99久久成人 | 久久精品国产99久久久 | 99久热RE在线精品99RE6 | 精品国产你懂的在线观看 | 美女大胆作爱全过程 | 欧美日韩一级在线 | 亚洲欧美日韩视频高清专区 | 欲求不满的寂寞人妻中文字幕 | 亚洲VS成人无码人在线观看堂 | 国产精品久久久久久久久免费樱桃 | 麻豆资源在线 | 午夜精品久久久久9999高清 | 国产亚洲精品久久久999密壂 | 亚洲毛片在线视频 | 国产乱子伦视频一区二区三区 | 中文字幕97在线 | 日日爱av | 国产日本欧美视频 | 99超碰在线人人 | 国产亚洲AV夜间福利香蕉149 | freesexvideos性少妇kant | 的九一视频入口在线观看 | 成人免费毛片病毒 | 日本a级在线播放 | 91区在线观看 | 欧美噜噜久久久xxx 日韩av一区二区三区四区 | 天天舔夜夜操 | 国产精品无码免费视频二三区 | 自拍偷拍另类亚洲 | 亚洲欧美日韩Aⅴ在线观看 日本成人影院 | 欧美特黄aaa| aⅴ免费一区二区三区 | 日本一区二区三区精品福利视频 |