国自产在线精品免费_国产精品国产三级在线_精品视频一区二区在线_91天堂素人_欧美亚洲日本在线_视频二区一区国产精品天天

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: m.liaru.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 正在播放露脸一区 | 中文无码精品a∨在线 | 中文字幕在线一区 | 激情另类小说区图片区视频区 | 欧美黑人狂躁日本寡妇 | 亚洲日韩亚洲另类激情文学 | 国产aⅴ无码久久久高潮老头 | 在线视屏| 日韩毛片免费视频一级特黄 | 国产乱色精品成人免费视频 | 中文字幕亚洲综合久久菠萝蜜 | 另类综合日韩欧美亚洲 | 免费看片免费播放国产 | 亚洲日本va午夜中文字幕久久 | 一本久道综合在线中文无码 | 亚洲天堂精品在线观看 | 红尘影院手机在线观看 | avtom影院址永久入口跳转 | 透逼视频| 乱色国内精品视频在线 | 欧美国产综合在线 | 国产精品久久久尹人香蕉 | 99热最新| 浮生影院大全免费观看高清版 | 人妻无码久久中文字幕专区 | 2019理论片一级 | 色窝窝无码精品一区二区 | 国产三级欧美三级 | 中国亚州女人69内射少妇 | 色婷婷狠狠18禁久久yyy☆ | 久久久久久中文 | av在线直接看 | 激情涩涩| 色第一页| 日本视频免费看 | 日本免费看黄色 | 深夜免费网站 | 成版人性视频 | 91精品国产综合久久久久久丝袜 | 999久久a精品合区久久久 | 日产日韩亚洲欧美综合 |